Propel vs Participate vs Maxwell Power: Which Is Best in CA?

The short answer

Propel discount
28-35% off cash by utility
Participate discount
Flat 30% in every utility

Propel takes 28% to 35% off by utility and transfers ownership automatically at Year 6. Participate takes a flat 30% with an Early Purchase Option from Year 6. Maxwell Power (HDM) takes about 25% to 30% with ownership from Year 6.

You are three proposals deep. One says Propel, one says Participate, and a third mentions Maxwell Power, which you may know as HDM. Each promises a big discount on solar and a battery, and none of them looks like the bank loan you expected.

There is a reason. The 30% homeowner tax credit ended on December 31, 2025, so these prepaid programs pass a commercial tax credit to you as a lower price. A third party owns the system for the first years, then you take ownership. This guide compares Propel vs Participate vs Maxwell Power side by side for California, so you can see how discounts, ownership timing and financing differ.

Propel vs Participate vs Maxwell Power: The Short Answer

Propel takes 28% to 35% off the cash price depending on your utility and transfers ownership automatically at Year 6. Participate Energy takes a flat 30% in every participating utility and offers an Early Purchase Option from Year 6. Maxwell Power, formerly HDM, takes about 25% to 30% with ownership beginning in Year 6. US Power can work with all three, and your utility, equipment and credit decide which one fits.

FeaturePropelParticipate EnergyMaxwell Power (HDM)
StructureTransitional Ownership: prepaid energy services agreement (ESA) plus a loanPrepaid solar leasePrepaid PPA
Discount vs cash28% to 35% by utilityFlat 30% in every participating utilityAbout 25% to 30%
Who owns it firstA third party, Years 1 to 5Participate Energy, Years 1 to 5A financial institution, until Year 6
How you become the ownerEarly Buyout Option, exercised automatically as Year 6 beginsEarly Purchase Option from Year 6, or keep the leaseTransfer beginning in Year 6
How you payLoan through Concert Finance, originated by Medallion BankCash or an approved lenderPrepayment under the agreement

Discounts are the advertised ranges and must be confirmed for each project. Your proposal shows the exact figure for your home.

How Do These Prepaid Programs Work?

All three rely on the same federal rule. A commercial owner holds the system at first and claims the commercial clean electricity credit, which homeowners cannot claim directly. That owner reflects part of the value in a lower price for you.

Why Ownership Waits Until Year 6

Federal investment tax credits generally carry a five-year recapture period under 26 U.S.C. Section 50(a). If a commercial owner transfers qualifying equipment too early, it may have to repay part of the credit. That is why the owner holds the system for the first five years and ownership moves to you after that.

How Big the Credit Can Get

Under Section 48E, a qualifying project can receive a 30% credit. Energy community and domestic content bonuses can each add 10 percentage points, so the combined credit can reach 50% for eligible projects. The owner claims it, and the discount you see depends on the program, your utility and your equipment.

The Section 48E(i) Caveat

The 2025 tax law added Section 48E(i), which restricts credits for certain residential solar leasing arrangements. Each program owner must confirm that your project and contract qualify. Tax eligibility is not guaranteed, so read the disclosure at the bottom of this page.

Propel vs Participate: Where the Two Differ Most

Ownership: Automatic or Optional

Propel is built to hand you the system. Its Early Buyout Option is already part of the original financing, and it is exercised automatically as Year 6 begins under the standard arrangement, unless you elect otherwise under the contract. You do not face a surprise purchase payment when Year 6 begins.

Participate works differently. Its Early Purchase Option begins in Year 6, and you choose whether to use it. The price follows the agreement's fair-market-value formula and may be very low or even $0, but $0 is not guaranteed. If you decline, you can continue under the prepaid lease. Our Participate Energy prepaid lease guide walks through those terms.

Financing and Payments

Propel is a Transitional Ownership program, not a plain prepaid lease. It pairs a prepaid energy services agreement with a loan from Concert Finance, originated by Medallion Bank, Member FDIC, and subject to credit approval. The loan covers the ESA and the Early Buyout Option, and you make one predictable monthly payment. The loan has no prepayment penalty, but paying it off early does not transfer the equipment before the scheduled buyout, because the loan and the ESA are separate obligations.

Participate lets you pay the prepaid lease amount in cash or through an approved lender. There are no ongoing monthly lease payments to Participate after the prepayment, and any monthly payment belongs to the separate loan. Our Propel prepaid lease explainer covers the Concert Finance side in detail.

Protections During the First Five Years

Propel's handout lists a 5-year performance guarantee based on at least 85% of estimated cumulative production, 5-year operations and maintenance coverage, a 10-year workmanship warranty, a 10-year roof penetration warranty, 15-year battery monitoring and 25-year solar monitoring. All are subject to the agreement's terms. For Participate, ask for the warranty and service terms in your agreement.

Where Maxwell Power Fits

Maxwell Power is the new name for HDM, so your proposal may still say HDM. A financial institution owns the system at first and claims the commercial credits, and you receive the savings as an upfront discount. Ownership comes in Year 6, because the five-year credit period has to run first.

The discount depends on the equipment you choose, because the underwriter keeps a spread and passes the rest to you. Our guide to the HDM Maxwell Power prepaid PPA explains the structure, and you should confirm the exact discount and Year 6 transfer terms in HDM's written agreement.

The Math: A $50,000 System Under Each Program

Here is an illustration, not a quote. These figures are before financing interest and fees.

  • Cash price: $50,000
  • Propel at 28% off: save $14,000 and pay $36,000
  • Propel at 35% off: save $17,500 and pay $32,500
  • Participate at a flat 30%: save $15,000 and pay $35,000
  • Maxwell Power at about 25% to 30%: save $12,500 to $15,000 and pay $35,000 to $37,500

The gap between programs is small compared with the gap between prepaid and cash, so ownership terms and your utility often matter more than a few points of discount. Run your own numbers in the US Power solar calculator, and see whether to buy or lease solar panels in 2026.

What This Means for California Homeowners

NEM 3.0 Makes the Battery Question Unavoidable

Under NEM 3.0, utilities pay very little for exported solar, and peak pricing runs 4 to 9 PM, when solar fades. A battery moves midday power into that window. Read are batteries worth it for solar in California and our guide to the best SCE rate plan for solar owners before you size one.

Availability Depends on Your Utility and Address

Propel's discount changes by utility, with LADWP near 28.7% and SCE up to 34.6% in US Power's launch pricing. Participate's 30% stays the same across LADWP, Southern California Edison, Burbank Water and Power and Pasadena Water and Power. Eligibility is still checked by address, equipment and credit.

What Should You Check Before You Sign?

Get the Ownership Terms in Writing

For Propel, confirm the automatic Early Buyout Option and any election rights. For Participate and Maxwell Power, ask for the Year 6 formula, the earliest date and any fees. A verbal promise of a $0 transfer is not a contract term.

Understand the Loan and the Agreement Separately

With Propel, the loan and the energy services agreement are separate obligations. Ask what happens to each if you sell, refinance or pay off early. Our guide to buying a house with solar panels shows what buyers ask about.

Confirm Tax Eligibility

Ask each provider how Section 48E(i) applies to your contract, and get the answer in writing before you rely on the discount.

Pick the Prepaid Option That Fits Your California Home

Propel takes 28% to 35% off, Participate takes a flat 30% and Maxwell Power takes about 25% to 30%. The better question is which ownership terms you can live with for a decade.

  • Choose Propel if you want ownership to transfer automatically at Year 6, with a financed buyout and a warranty set built into the program.
  • Choose Participate if you want the same 30% in every utility territory and the choice to buy in Year 6 or keep the lease.
  • Choose Maxwell Power if its equipment options and Year 6 ownership fit your plans, and you confirm the discount in its written agreement.

Whichever you pick, plan to stay at least six years. US Power's CSLB-licensed consultants pair factory-direct Qcells pricing, 15% to 20% below market, with American-made Qcells panels, a 25-year comprehensive warranty and a 3 to 4 week install to PTO. To see which program fits your usage, book your free 12-month bill analysis and we will run the numbers with you.

Prepaid solar is a contract first and a discount second, so read it that way.

Program disclosure: Discounts, financing rates, eligible equipment, utility availability, tax eligibility and ownership terms are subject to change and are not guaranteed for every project. All terms are governed by the executed agreements for each program. This article is informational and is not tax, legal or financial advice.

Frequently Asked Questions

Is Propel better than Participate for California homeowners?

How much cheaper is prepaid solar than buying solar in California?

Does prepaid solar transfer ownership to me automatically?

Can I sell my house with a prepaid solar program?

Do I still get the 30% federal solar tax credit with prepaid solar?

Financing & Solar Ownership

Published

October 14, 2026

Team Social Icon 04Team Social Icon 02LinkedIn Icon DarkTeam Social Icon 03

About the Article

Technical details were reviewed by Erik Sords, Senior Energy Consultant at US Power, who holds CLSB License and has 15+ years of experience in Solar and Roofing.

Last Reviewed:

November 23, 2026

Related Articles

Our Related Blogs

Blog Image
US Power Logo NewSolar Basics & Guides

Can You Oversize Solar Panels on MPPT Controller? (2026 Guide)

Will extra solar panels fry my charge controller or just waste power? Your 2026 Guide

Read More
Blog Image
US Power Logo NewSolar Basics & Guides

Is Your Solar Installation Done Right? 7 Quality Red Flags

One loose connector could void your home solar warranty and damage your home.

Read More
Blog Image
US Power Logo NewSolar Basics & Guides

Can Your HOA Stop You from Going Solar?

Understand HOA rules and your rights when planning to install solar in California.

Read More

Get an instant solar estimate using satellite!